Event 1 Integrator Help

Online Help

Budget Code Settings - Interface



Settings / Budget Code Settings

Interface Status

Do not interface
No budget codes will be created in Prolog Manager based on Timberline codes.
One way, Timberlne to Prolog
Timberline Extra, Cost Code and Category records that have been setup for each job being integrated will be used to create or update Budget Code records in Prolog Manager.
One way, Prolog to Timberline
Not available.
Bi-directional
Not available.

Allow override

This box controls whether the user will have the ability to turn this interface off for a given run while in the 'Determine Modifications' wizard.  If this box is checked, the user will be able to uncheck the option representing the Budgets interface so that budgets are not exchanged on that run.  If unchecked, the user will be unable to prevent budgets from being exchanged.  If the Interface Status is set to Do not use and this box is unchecked then the Budget Code interface will not be shown in the 'Determine Modifications' wizard.

Retain history of exchanged data

If this box is checked, each modification performed for either the Timberline or Prolog Manager database will be logged in a "History" table in the Integrator database.  This information can be used for auditing and reporting purposes although no standard reports are included for this purpose.

Save

Click this button to save the settings contained in this window to the Integrator database.

Cancel

Click this button to dismiss this window without saving changes to any of the settings.

See Also

Content updated 5/25/2011

Copyright © 2011 Event 1 Software, Inc.  This documentation may not be copied in full or in part without written permission from Event 1 Software, Inc.